TRANSFER OF THE INSCOM CENTER LANE PROJECT (ICLP) EFFORT TO DIA/USAMRDC
CIA-STARGATE
PDF Scan: PDF
Open AI Summary
Summary:
This document, dated July 17, 1984, discusses the planned transfer of the INSCOM CENTER LANE Project (ICLP) from USAINSCOM to both DIA and USAMRDC. The purpose of the document is to educate DIA and USAMRDC officials about ICLP procedures, benefits, and requirements, as well as propose a minimally disruptive transfer process. It is recommended that ICLP collection activities be discontinued by September 30, 1984, and personnel, facilities, and equipment be transferred to DIA/USAMRDC between October 1 and December 31, 1984. Training of ICLP personnel is also set to continue through December 31, 1984. Considerations include personnel spaces, equipment and facilities, and the need to consider assignment preferences of volunteer personnel. The document also asserts the importance of transferring the ICLP as a "package deal" in order to maintain continuity and ensure success. The actions taken as stated in the document include the authorization to continue training and existing contracts, as well as carrying out operations until September 30, 1984. The document concludes with arrangements being made to contact and inform contractors of the status change of the project.
Text
Body: r% rM149r
Approved For Release 2000/ fl-l - 9 -00788 R001500100010-5
LTC Brian Buzby/7829
17 July 1984
SUBJECT: Transfer of the INSCOM CENTER LANE Project (ICLP)
effort to DIA/USAMRDC.
1. (S/CL-3/NOFORN) ISSUE: On 13 July 1984, notice was
officially given of the intent to transfer the operational
intelligence collection portion of the INSCOM CENTER LANE
Project (ICLP) to DIA, and the R&D aspects to USAMRDC.
2. (S/CL-3/NOFORN) PURPOSE: To educate DIA and USAMRDC
officials as to ICLP procedures, benefits, and requirements,
and outline possible mechanisms for a minimally disruptive
transfer of the ICLP effort from USAINSCOM to DIA/USAMRDC.
3. (U) RECOMMENDED COURSE OF ACTION:
a. (S/CL-3/NOFORN) Discontinue ICLP collection activities
effective 30 September 1984.
b. (S/CL-3/NOFORN) Transfer personnel, facilities, and
equipment to DIA/USAMRDC during the period 1 October - 31
December 1984.
c. (S/CL-3/NOFORN)
through 31 December 1984.
Continue training of ICLP personnel
4. (U) CONSIDERATIONS/PROBLEMS/SUGGESTED SOLUTIONS:
a. (C) Personnel spaces: INSCOM has no spaces it
can/will transfer. It is recommended that a compromise
solution be adopted wherein INSCOM attaches personnel to
DIA/USAMDRC, with the stipulation that DIA obtain authorized
"slotting" under the FY 86 GDIP to support the operational
program, and USAMDRC provide appropriate personnel spaces for
the R&D effort. Personnel attached will either revert to
I:NSCOM or PCS to DIA/USAMDRC by 30 September 1985.
WARNING NOTICE: CENTER LANE SPECIAL ACCESS PROGRAM
RESTRICT DISSEMINATION TO THOSE WITH VERIFIED ACCESS
TO CATEGORY THREE (3)
SENSITIVE INTELLIGENCE SOURCES AND METHODS INVOLVED
NOT RELEASABLE TO FOREIGN NATIONALS
CLASSIFIED BY: CDR, INSCOM
DECLASSIFY ON: OADR
COPY 2. OF I COPIES
Approved For Relea >'0 DP96-00788R001500100010-5
T,. 1,t 1 2
Approved For Release 20 I 96-00788 R001500100010-5
IAGPA-F-SD
17 Jul 84
b. (C) Equipment and facilities: Recommend drafting memo
of understanding with INSCOM and HQ, Ft. Meade allowing present
facilities and equipment use for continuation of operations
under DIA/USAMRDC auspices.
c. (S/CL-1/NOFORN) Because psychoenergetic activities
constitute "Experimentation on Human Subjects," as determined
by DoD and Army General Counsel, assignment preferences of
volunteer personnel must be considered.
5. (S/CL-3/NOFORN) POINTS SUPPORTING RECOMMENDED POSITION:
Seven years of practical experience have proven the necessity
of a proper source/interviewer/analyst and management mix.
Transfer of ICLP as a "package deal" insures continuity, the
greatest prospect of success, and the least amount of
disruption, as well as guarantees the retention of
indispensable "institutional memory."
6. (U) ACTION TAKEN:
a. (S/CL-3/NOFORN) Authorized to continue training in FY
b. (S/CL-2/NOFORN) Authorized to continue with existing
contracts. Will continue as COTR.
c. S/CL-3/NOFORN) Operations are to continue to 30
September 1984.
d. (S/CL-2/NOFORN) Local training is to continue, pending
final disposition of the Project.
e. (S/CL-2/NOFORN) Authorized to notify "customers" of
change of directive.
f. (S/CL-3/NOFORN) Arranging to contact and inform
contractor of Project's status change.
Approved For Release 2000/08/08 : CIA-FM ,P 6-00788R001500100010-5