ANALYST DISCUSSIONS; REPORT RE. SESSION D-74

CIA-STARGATE

PDF Scan: PDF

Open AI Summary

The document is a verbal report to Project 8035 analyst from 10 October 19. The target described is a desolate area with a column of fire going straight up and several large holes. There is a metal domed hangar-like building with heavy fork lift vehicles and a storage area for large pipes. The target also includes a rocket vehicle poised to take off. The acquisition of the target was approximately 12 days prior to 09 October 1980. The report mentions the assembly and movement of a device with three sections, with the final assembly being most intense around 18 October 80. The device was eventually rolled out of the warehouse and there was research and picture taking happening. The launch was estimated to occur around 22-23 October 80.

Text

Body:  roved For Release 2000/08/07 CIA-RDP96-00788R000500020001-5
 . Ar Cf)      /~~ P-e5 7,--Y~ -?~f /-,a
 C;~V~W,7, ~y
 Gnu
 -    Iv 'Ya
 /~
 te              ~'"                   te.             .c.`
 /'    /(odd   Y .
 Approved For Rel ase 2000/08 07 CIA-RDP96-00788R000500020001-5
 Approved For Release 2000/08/07 : CIA-RDP96-00788R000500020001-5
 SG1A
 SG1J
 am'
 SG 1 A
 App           lease 20
 rove
 rRE
 h
 RD
 Approved For Release 2000/08/07 : CIA-RDP96-00788R000500020001-5
 cti
 '-p
 C            C'~c-~~ -c-      ~1  c
 zt,-~ /d6L~~ I
 6P21- llt,7-
 Approved For Release 2000/08/07 : CIA-RDP96-00788R000500020001-5
 Approved For Release 20Q
 et c,o i   ~7
 Interim verbal report to Project 8035 analyst,  10 October 19
 Target was  the third on the  list  provided telephonically.
 SG1A
 .Following is gist of the description provided:
 a.   A column of fire going straight up.                         SG1A
 b.   A desolate, but rolling area with the ground opening
 into a mound.
 c.   Several large holes over a wide area,  four or five.
 d.   Slight border of green on the left.
 e.   A metal domed shape like an old hangar, made of metal.
 f.   Approximately four very heavy fork lift type vehicles
 working inside the hangar-type building.
 g.   Looked like a big storage area for huge pipes 3'-4'  in
 diameter.
 h.   Feeling that what was being looked for was already gone.
 Directed=to go back in time and look for that which was being sought.
 a.   A rocket vehicle of some sort, poised to take off,  in
 the ground.
 b.   Time of  acquisition of  target:   approximately  12 days prior
 to 09 October 1980.
 Directed to return to the warehouse/hangar type building and present
 time.
 a.   Same large cylinders,  feeling of maintenance.
 b.   Move to 12 Oct 80 -   large cylinder gone.
 c.   15 Oct -   working on something smaller.
 d.   18 Oct - assembly of a front portion to the main portion.
 e.   18 Oct -   feeling of final assembly.   There are three
 section to the"thing"
 f.   The front is the "carrier",  the center is the power source,
 the tail is the fuel, having almost a "needle" nose cone,
 which later appeared more rounded.
 Directed to follow the device forward in time.
 a.   Device rolled out of warehouse on several carriers to the
 field.   (no appreciation for distance)
 b.   No people going on it.
 c.   Research, picture taking.
 d.   Time to launch from the last day of future  (18 Oct 80)
 + 2 days for movement  ( 0/A 20 Oct 80)
 + 2-3 days for launch  (0/A 22 - 23 Oct 80)
 NOTE   Activity level was most intense during the period in which
 the three section were being assembled,  circa 18 Oct 80.
 DP96-00788R000500020001-5
 Approved For Release 20001                - 07 8R       2  01-