TASKING

CIA-STARGATE

PDF Scan: PDF

Open AI Summary

This document from the CIA's Stargate program provides a summary of various sessions conducted as part of the SG1 B project. The sessions were held on September 8th and 12th, as well as September 25th and October 15th in 1980. The purpose of these sessions was to determine the capacity of the Grill Flame program to support operational and technical intelligence requirements. The document mentions that a new tasking was received on October 10th, requesting detailed information on the shape and composition of a device currently being assembled.

The document also mentions that the last two sessions did not have a formal evaluation forwarded due to withdrawal from Grill Flame participation. However, verbal discussions indicate that the information provided during these sessions was of significant value, especially in determining the stage of development of the current device.

Formal evaluations were received for the first seven sessions, providing information on the shape and size of the device. These evaluations are attached as enclosure 22. A request for a final evaluation that includes the last two sessions resulted in findings that the most useful information provided was on SG1C. The evaluation for SG1C is included as enclosure 3.

This document is classified as secret and was approved for release on August 7th, 2000.

Text

Body:  Approved For Release 2000/08/07 :  -           0788R000500220001-3
 SG1 B
 concern!
 First
 Session
 08
 Sept 80
 1330
 hours
 First Viewer
 Second
 Session
 08
 Sept 80
 1330
 hours
 Second Viewer
 (Run simultaneously)
 Third
 Session
 08
 Sept 80
 1530
 hours
 Third Viewer
 Fourth
 Session
 08
 Sept 80
 1530 hours
 Fourth Viewer
 (Run simultaneously)
 Fifth
 Session
 12
 Sept 80
 0900 hours
 First Viewer
 Sixth
 Session
 12
 Sept 80
 0900 hours
 Fourth Viewer
 (Run simultaneously)
 Seventh Session
 25
 Sept 80
 1430 hours
 Fourth Viewer
 TASKING
 Determine Grill Flame capacity to support Operational and Technical
 Intelligence requirements
 New taskinq was received 10 October.1980:   'Report detailed information
 on shape and composition of device currently in assembly building.   (Incl 1)
 Eighth Session
 15 Oct 80
 0900 hours
 First Viewer
 Ninth Session
 15 Oct 80
 0900 hours
 Fourth Viewer (Run simultaneously)
 These last two sessions never had a.formal evaluation forwarded as a
 result of         ithdrawl from Grill Flame participation.  Verbal discussions
 with          personnel involved in the original evaluation indicate information
 provided was of significant value, particularly in determining stage of devel-
 opment of current
 EVALUATIONS
 Formal evaluations were recieved on the first seven sessions.  Grill Flame
 pro
 SG1B           to;
 shape and Device size.  Comments are attached as inclosure 22.
 A request for final evaluation to include the last two sessions resulted in
 S G1C       findings that; the most useful information provided was on
 SG1C
 SG1C             Evaluation is attached as Inclosure 3.
 CLASSIFIED BY:   051630Z JUL 78
 MSG, HQDA (DAMI--I
 REVIEW ON:                                                                                              AUGUST 2002
 SECRET   GRILL FLAME
 Approved For Relea'69'          -M        66W6B Wa500220001-3