TASKING
CIA-STARGATE
PDF Scan: PDF
Open AI Summary
This document from the CIA's Stargate program provides a summary of various sessions conducted as part of the SG1 B project. The sessions were held on September 8th and 12th, as well as September 25th and October 15th in 1980. The purpose of these sessions was to determine the capacity of the Grill Flame program to support operational and technical intelligence requirements. The document mentions that a new tasking was received on October 10th, requesting detailed information on the shape and composition of a device currently being assembled.
The document also mentions that the last two sessions did not have a formal evaluation forwarded due to withdrawal from Grill Flame participation. However, verbal discussions indicate that the information provided during these sessions was of significant value, especially in determining the stage of development of the current device.
Formal evaluations were received for the first seven sessions, providing information on the shape and size of the device. These evaluations are attached as enclosure 22. A request for a final evaluation that includes the last two sessions resulted in findings that the most useful information provided was on SG1C. The evaluation for SG1C is included as enclosure 3.
This document is classified as secret and was approved for release on August 7th, 2000.
Text
Body: Approved For Release 2000/08/07 : - 0788R000500220001-3
SG1 B
concern!
First
Session
08
Sept 80
1330
hours
First Viewer
Second
Session
08
Sept 80
1330
hours
Second Viewer
(Run simultaneously)
Third
Session
08
Sept 80
1530
hours
Third Viewer
Fourth
Session
08
Sept 80
1530 hours
Fourth Viewer
(Run simultaneously)
Fifth
Session
12
Sept 80
0900 hours
First Viewer
Sixth
Session
12
Sept 80
0900 hours
Fourth Viewer
(Run simultaneously)
Seventh Session
25
Sept 80
1430 hours
Fourth Viewer
TASKING
Determine Grill Flame capacity to support Operational and Technical
Intelligence requirements
New taskinq was received 10 October.1980: 'Report detailed information
on shape and composition of device currently in assembly building. (Incl 1)
Eighth Session
15 Oct 80
0900 hours
First Viewer
Ninth Session
15 Oct 80
0900 hours
Fourth Viewer (Run simultaneously)
These last two sessions never had a.formal evaluation forwarded as a
result of ithdrawl from Grill Flame participation. Verbal discussions
with personnel involved in the original evaluation indicate information
provided was of significant value, particularly in determining stage of devel-
opment of current
EVALUATIONS
Formal evaluations were recieved on the first seven sessions. Grill Flame
pro
SG1B to;
shape and Device size. Comments are attached as inclosure 22.
A request for final evaluation to include the last two sessions resulted in
S G1C findings that; the most useful information provided was on
SG1C
SG1C Evaluation is attached as Inclosure 3.
CLASSIFIED BY: 051630Z JUL 78
MSG, HQDA (DAMI--I
REVIEW ON: AUGUST 2002
SECRET GRILL FLAME
Approved For Relea'69' -M 66W6B Wa500220001-3