PAG-TA MONTHLY ACTIVITY REPORT - FEBRUARY 1995

CIA-STARGATE

PDF Scan: PDF

Open AI Summary

The CIA Stargate program's monthly activity report for February 1995 reveals the following information:

1. Personnel: The authorized strength of the program remains at 11, with six personnel assigned.

2. Administration: The program moved to Building 2845 on January 19, 1995. Excess property from the former facility was removed on February 9, 1995.

3. Training: One team member is scheduled to attend a sign language course from April 17 to June 12, 1995.

4. Travel: No travel was reported for February 1995.

5. Transportation/Logistics: The mileage report for February 1995 was forwarded to DAL-2 on March 1, 1995.

6. Operations: The program supported ONI in their effort to locate a person wanted on fraud and racketeering charges by the FBI. Information on the target was provided, but no evaluation has been received yet. The program also supported JIATF-West in describing a target involved in drug activities, as well as JIATF-5 in their efforts to ascertain the landing of a drug shipment in Mexico. No evaluation has been received for either operation.

7. Future Highlights: A follow-on meeting is scheduled with ORD/CIA on March 1, 1995. TICR participation has been completed and the final draft report will be sent to CMS on March 17, 1995.

8. Other: No other information was reported.

Please note that some portions of the document may be classified as S/NF/WN/SG/LIMDIS, indicating its sensitivity and limited dissemination.

Text

Body:  Approved For Release 2000/08/
 DP96-0078~9NF~~~~~.~?~~3~(~(b~~NMENT
 memorandum
 DATE:   $   Mar  95                              S-23, 020/PAG-TA
 REPLY TO
 ATTN OF:   PAG-TA
 sue.tECT:   pAG-TA Monthly Activity Report -  February   1995  (U)
 To:    PAG
 1.  (U) Personnel:
 - Per NMIPC (P-AS1) our authorized strength remains at
 11 with six personnel assigned.
 2.   (U) Administration:
 - PAG-TA move to Building 2845 was effected on 19 Jan 95.
 Removal of excess property from our former facility was
 accomplished on 9 February 1995.  A superb team effort
 by all our personnel.  Special thanks to ~~for their
 QQ;~g~~i~,stical/manpower support for both acti  s.
 ~s`p'~ially commendable was the effort of
 ~ as our overall POC for both actions.
 3 .   (L~G'~' Jaining:
 -        emains scheduled to attend the sign
 language lave  one course (17 Apr -12 June 95).
 4.    (C) Travel:
 - None.
 5.    ('U) Transportation/Logistics:
 - Feb 95 mileage report forwarded to DAL-2 on
 on 1 Mar 95.
 REPRODUCTION REQUIRES          WARNING NOTICE-INTELLIGENCE
 APPROVAL OF ORIGINATOR         SOURCES OR METHODS INVOLVED
 OR HIGHER DOD AUTHORITY
 FURTHER DISSEMINATION
 ONLY AS DIRECTED BY PAG
 OR HIGHER DOD AUTHORITY
 CLASSIFIED BY MULTIPLE SOURCES
 DECLASSIFY ON OADR
 OPTIONAL FORM NO. 10
 NOT  RELEASABLE  TO  FOREIGN NATIONALS                                                            ~s  FPMR(41CFR)101-11.8
 Approved For Release 2000/08/0$~fi~A~~~96-00789R0025002~t~95-5
 Approved For Release 2000/08/0  P96-007898002500230005-5
 6.  (S/NF/WN/SG/LIMDIS) Operations:             SG1B
 - Supported ONI in their effort to locate a
 personality who is wanted on numerous fraud and
 racketeering charges by the FBI.  Individual a key
 player in their counter-drug effort.  Information on
 target personality provided to ONI.  To date, no
 evaluation received.
 SG11
 - Supported JIATF-West in describing a target personality
 involved in drug activities.  Information provided is
 to be used in the possible apprehension or location of
 the target personality.  To date, no evaluation has been
 received.  It should be noted that our information never
 stands alone and is always used in conjunction with the
 other INTs.
 - Supported JIATF-5 in their efforts to ascertain when and
 where a drug shipment by air would land in Mexico.
 Information on possible times, dates and location
 provided.  Feedback from the customer reveals that the
 operation was aborted; hence no way of evaluating our
 reporting. SG1J
 - 08 Feb 95:             chaired the monthly STIC-C
 meeting.               as to results and sent to
 STIC/STIC-C  ~sl~r~ssees.                                   SG11
 - 06 Feb 95:                              met with            -
 CIA/ORD, and newly designated Program
 Manager for Project STAR GATE.  Memo prepared and
 forwarded to PAG/PA.  Due to icy road condition,
 15 Feb 95 follow-on meeting was rescheduled for
 7~ ~4`~~  9 5 .
 -            attended Technical Intelligence Collection
 Review (TICR)/Community Steering Group meetings.  He is
 SG1C
 REPRODUCTION REQUIRES              WARNING NOTICE-INTELLIGENCE
 APPROVAL OF ORIGINATOR             SOURCES OR METHODS INVOLVED
 OR HIGHER DOD AUTHORITY
 FURTHER DISSEMINATION
 ONLY AS DIRECTED BY PAG
 OR HIGHER DOD AUTHORITY
 2
 Approved For Re~aTS~~b~a~~~ :~.?1~3~-X00230005-5
 STAR GATE
 Approved For Release 2000/08/Oar#1i~el~BP96-007898002500230005-5
 SG1C
 7.  (S/NF/SG/LIMDIS) Future Highlights:
 SG11   1 Mar 95:  Follow-on meeting set for our location with
 ORD/CIA.
 - TICR participation completed.  Final draft report to CMS
 on 17 Mar 95.
 SGFOIA3
 8.   (U) Other:
 - None.
 REPRODUCTION REQUIRES
 APPROVAL OF ORIGINATOR            WARNING NOTICE-INTELLIGENCE
 OR HIGHER DOD AUTHORITY           SOURCES OR METHODS INVOLVED
 FURTHER DISSEMINATION
 ONLY AS DIRECTED BY PAG
 OR HIGHER DOD AUTHORITY
 ~~~~
 Approved For Re~aTS~~b~~?~b~~~I~J~-(~~~~500230005-5