PAG-TA MONTHLY ACTIVITY REPORT - DECEMBER 1994

CIA-STARGATE

PDF Scan: PDF

Open AI Summary

This document is a monthly activity report for the PAG-TA unit of the Stargate program in December 1994. The report includes information on personnel changes, administration updates, training, travel, transportation/logistics, operations, and future highlights.

Highlights from the report include:
- The authorized strength of the unit remains at seven personnel assigned.
- One person accepted a position in the NMISC, with the transfer effective on January 23, 1995.
- The unit moved to Building 2845 on January 19, 1995.
- Clean up day at the old facility took place on December 2, 1994.
- Promotion packets were provided for completion.
- There was no training or travel during the month.
- The unit provided support for PAN/PAG and Joint Interagency Task Force-West/East requirements.
- Software and the optical disk drive for the foreign data base management system were installed.
- Briefings were conducted with key CIA/CMS representatives regarding the unit's mission, functions, and organization.
- A project status report was provided to PDO in response to a SAPOC request for information.
- The monthly STIC-C meeting was chaired, and a report was sent to the STIC/STIC-C address.
- Meetings were held regarding mission requirements and drafted protocols for follow-on support activities.
- The unit attended Technical Intelligence Collection Review (TICR) meetings.
- The unit moved to Building 2845 on January 19, 1995.
- Continued participation in TICR meetings through February 1995.
- A CDA response and monthly STIC-C meeting were scheduled for January 11, 1995.

No other significant information is provided in the report.

Text

Body:  Approved For Release 2000/08/08 : CIA-RL ,9r610D789R002500230012-7
 UNITED STATES GOVERNMENT
 memorandum
 DATE: 25 January 1995                                          S-23,003/PAG-TA
 REPLY TO
 ATTN OF: PAG-TA
 SuBJEcT: PAG-TA Monthly Activity Report - December 1994  (U)
 To: PAG
 1.    (U) Personnel:
 - Per NMIPC (P-AS1)  our authorized strength remains at
 ~;jGjaj.th seven personnel assigned.
 was offered and accepted a position in
 the NMISC (SV-3).   Effective date of the transfer is
 23 Jan 95.
 2.    (U) Administration:
 - PAG-TA move to Building 2845 is scheduled for 19 Jan 95.
 - Clean up day at old facility was h7Mjon 2 Dec 94.
 - W8)promotion packets provided to
 for completion.
 3.    (U) Training:
 - None.
 4.    (C) Travel:
 - None.
 5.    (U) Transportation/Logistics:
 - Dec 94 mileage report forwarded to DAL-2 on
 on 4 Jan 95.
 REPRODUCTION REQUIRES
 APPROVAL OF ORIGINATOR
 OR HIGHER DOD AUTHORITY
 WARNING NOTICE-INTELLIGENCE
 SOURCES OR METHODS INVOLVED
 FURTHER DISSEMINATION
 ONLY AS DIRECTED BY PAG
 OR HIGHER DOD AUTHORITY
 CLASSIFIED BY MULTIPLE SOURCES
 DECLASSIFY ON OADR
 OPTIONAL FORM NO. 10
 IR_ 1-801
 Approved For Relem!90ftWLQ?AIM&R            Wd  $>   MtUVAI&7                                                                        G
 SAFPMR(41CFR)101-11.6
 STAR GATE                                                                                       5010-114
 Approved For Release 2000/08/08 : CIA-RDP96-00789R002500230012-7
 6.  (S/NF/WN/SG/LIMDIS)  Operations:
 - To date, we have completed six projects in support of
 PAN/PAG.   Additional requirements from PAG-1 are
 anticipated.
 - Four projects were conducted in support of Joint
 Interagency Task Force-West (formerly JTF-5)
 requirements.   Since 3 Mar 94 we have completed 33
 projects.
 - Four projects were conducted in support of Joint
 Interagency Task Force-East (formerly JTF-4)
 requirements. To date we have completed eight projects.
 - Software and the optical disk drive for our foreign data
 base management system installed.  We are awaiting for
 the contractor to install the program that will preclude
 the data to be stored on the hard disk drive.
 - 6 Dec 94:   At our initiative we briefed key CIA/CMS reps
 regarding our mission, functions and organization.
 Memorandum forwarded as to results.
 - 13 Dec 94:   Project STAR GATE status report provided to
 PDO in respc8GeJto a SAPOC request for information.
 - 14 Dec 94:                chaired the monthly STIC-C
 meeting.  M             1J as to results and sent to
 STIC/STIC-C address
 - 15 Dec 95:   Mes    . opm
 met with             at our location regarding mission
 requirements.                  as drafted protocols for our
 follow-on support a& 3.irities.
 - 5/8/12/19 Dec 94:                   ttended Technical
 SG1C           Intelligence Collection Review (TICR) meetings.   He is
 REPRODUCTION REQUIRES
 APPROVAL OF ORIGINATOR
 OR HIGHER DOD AUTHORITY
 FURTHER DISSEMINATION
 ONLY AS DIRECTED BY PAG
 OR HIGHER DOD AUTHORITY
 WARNING NOTICE-INTELLIGENCE
 SOURCES OR METHODS INVOLVED
 Approved For Relea 8~0 fig(>    ,  i -r~IGN 0HW39M-
 STAR GATE
 Approved For Release 2000/08/08 : Cl      ~QR002500230012-7
 SG1C
 7.    (S/NF/SG/LIMDIS)  Future Highlights:
 - 19 Jan 95:   Move to Building 2845.
 - Continued participation TICR participation through
 Feb 95.
 - CDA respons(6(r,4 JSAC due.
 - 11 Jan 95:                  tc8(so6A3monthly STIC-C meeting.
 8.   (U)  Other:
 - None.
 REPRODUCTION REQUIRES                   WARNING NOTICE-INTELLIGENCE
 APPROVAL OF ORIGINATOR                  SOURCES OR METHODS INVOLVED
 OR HIGHER DOD AUTHORITY
 FURTHER DISSEMINATION
 ONLY AS DIRECTED BY PAG
 OR HIGHER DOD AUTHORITY
 NOT RELEASABLE TO FOREIGN NATIONALS
 Approved For Release 2000/08/08: CI94"t89R002500230012-7